All Topics |
Topic: “diversion”
Author | Message |
---|
Subject: diversion
Posted: 4/19/2010 Viewed: 40329 times
Dear all
How can i eliminate several diversions on a river after activation of a dam because after dam construction the demands are delivered by new diversions or transmision links. Thanks |
Subject: Re: diversion
Posted: 5/6/2010 Viewed: 40260 times
The easiest way is to set the Maximum Flow Volume (for Transmission Links) or Maximum Diversions (for Diversions) to zero once the Dam becomes active. This will not remove the diversions from your schematic, but it will remove them from your calculations during the latter part or your simulations.
|
Topic: “diversion”