All Topics | Topic: “limiting hydropower generation to ...”
Author Message
Mr. behzad jamali
Subject: limiting hydropower generation to ...   
Posted: 10/2/2013 Viewed: 27350 times

Hi all
Does anybody know how can I limit hydropower generation to 1) power-plant's production capacity and 2) min and max head requirement? I have this problem with a reservoir which has 2000 MW production capacity, and 12 hr plant factor. Most of the time, the monthly hydropower generations are higher than max generation capacity (2000 MW*24 hr*30 day = 1440 GWh).
Topic: “limiting hydropower generation to ...”