Welcome to WEAP's Website WEAP
WEAP is an initiative of the Stockholm Environment Institute.


About WEAP

Home
Why WEAP?
Features
What's New?
Sample Screens
Demonstration
Publications
History and Credits

Using WEAP
Download
Licensing
User Guide
Tutorial
Videos (YouTube)

User Forum
Discussions
Members List
Edit Profile

Additional Support
Training
University Courses
Collaboration

About Us
SEI-US Water Resources Program
Please Contact Us

LEAP
Interested in Energy?
Read about LEAP: SEI's software for energy planning.

Link WEAP and LEAP for combined Water-Energy planning.
Watch a video demo!
   

User Forum

All Topics | Topic "limiting hydropower generation to ..."
Log in to post new messages or reply to existing messages.
 
Author Message
Mr. behzad jamali

Subject: limiting hydropower generation to ...   
Posted: 10/2/2013 Viewed: 24744 times
Hi all
Does anybody know how can I limit hydropower generation to 1) power-plant's production capacity and 2) min and max head requirement? I have this problem with a reservoir which has 2000 MW production capacity, and 12 hr plant factor. Most of the time, the monthly hydropower generations are higher than max generation capacity (2000 MW*24 hr*30 day = 1440 GWh).
Topic "limiting hydropower generation to ..."