All Topics |
Topic: “warnings: demand site has no transmission link into it.”
Author | Message |
---|
Subject: warnings: demand site has no transmission link into it.
Posted: 6/14/2016 Viewed: 16127 times
Hello, my name is Rebeca and I'm running a pretty big system in WEAP. I'm receiving several warning messages stating that demand sites have no transmissions links to it. I've checked and the demands are connected to transmission links. Do you know what could be happening? Here's a picture of how it looks like: http://psr.me/h202by
Thank you, Rebeca |
Subject: Re: warnings: demand site has no transmission link into it.
Posted: 6/14/2016 Viewed: 16120 times
Rebeca,
When I look at your area, I see that the problem is that you have the transmission links flowing the wrong direction. The flow should go from the river to the demand site (the arrowhead should point into the demand site). When you create the transmission link, first click on the source (river), then double click on the destination (demand site). Jack |
Topic: “warnings: demand site has no transmission link into it.”