Subject: WEAP LEAP Link Problem on Time Slices Posted: 12/15/2021 Viewed: 4496 times
Hi, I have experienced a problem when linking LEAP and WEAP, that is, the time slice can not be linked properly.
In the linkage interface in LEAP, LEAP does not allow me to link LEAP January to WEAP January.
LEAP February is linked to WEAP January; LEAP March is linked to WEAP February; LEAP April is linked to WEAP March; so far so on; in the end, no month is linked with LEAP January.
Does anyone know the solution to this problem?
Thanks
Xin