Welcome to WEAP's Website WEAP
WEAP is an initiative of the Stockholm Environment Institute.


About WEAP

Home
Why WEAP?
Features
What's New?
Sample Screens
Demonstration
Publications
History and Credits

Using WEAP
Download
Licensing
User Guide
Tutorial
Videos (YouTube)

User Forum
Discussions
Members List
Edit Profile

Additional Support
Training
University Courses
Collaboration

About Us
SEI-US Water Resources Program
Please Contact Us

LEAP
Interested in Energy?
Read about LEAP: SEI's software for energy planning.

Link WEAP and LEAP for combined Water-Energy planning.
Watch a video demo!
   

User Forum

All Topics | Topic "Simulation of WWTP operation"
Log in to post new messages or reply to existing messages.
 
Author Message
Mr. Simeon wambugu

Subject: Simulation of WWTP operation   
Posted: 5/6/2024 Viewed: 1350 times
Hi,
I am planning to simulate the operation of 11 waste water treatment plants with different capacities in different urban areas, whereby I want to check when their capacities will be exceeded as the years go by into the future due to the increase in waste water generated from urban population growth. My design horizons are 2024 (the current year) and going up to 2050. I have three growth rate scenarios. To generate the waste water, I am using a certain fraction of the total water that is consumed. How can I link all this to WEAP? Thank you.
Ms. Anne Hereford

Subject: Re: Simulation of WWTP operation   
Posted: 5/7/2024 Viewed: 1310 times
Dear Simeon,
You'll need to add all 11 WWTPs to your model, along with relevant data such as their respective capacities. You can model the demand as one or multiple demand sites. If fewer demand sites than WWTPs, you will need to direct different fractions of the return flow to the relevant WWTPs. You will input the projected changes in population (as well as any projected changes in per capita use) into the demand site(s).

For more on getting started in WEAP, please reference the Tutorial and Videos linked on the left side of the WEAP website.

Best,
Anne
Mr. Simeon wambugu

Subject: Re: Simulation of WWTP operation   
Posted: 5/17/2024 Viewed: 1028 times
So the return flow in this case will be the waste water?
Mr. Doug Chalmers

Subject: Re: Simulation of WWTP operation   
Posted: 5/28/2024 Viewed: 890 times
Yes, the return flow links between your demand sites and the WWTPs would represent the wastewater.
Topic "Simulation of WWTP operation"