Welcome to WEAP's Website WEAP
WEAP is an initiative of the Stockholm Environment Institute.


About WEAP

Home
Why WEAP?
Features
What's New?
Sample Screens
Demonstration
Publications
History and Credits

Using WEAP
Download
Licensing
User Guide
Tutorial
Videos (YouTube)

User Forum
Discussions
Members List
Edit Profile

Additional Support
Training
University Courses
Collaboration

About Us
SEI-US Water Resources Program
Please Contact Us

LEAP
Interested in Energy?
Read about LEAP: SEI's software for energy planning.

Link WEAP and LEAP for combined Water-Energy planning.
Watch a video demo!
   

User Forum

All Topics | Topic "Reliability"
Log in to post new messages or reply to existing messages.
 
Author Message
Miss laleh Mahmoudian

Subject: Reliability   
Posted: 5/13/2010 Viewed: 33833 times
Hi

How can i have the Reliability during the specific time not the whole of the calibration and simulation time?

Thanks
Mr. Jack Sieber

Subject: Re: Reliability   
Posted: 5/13/2010 Viewed: 33824 times
The WEAP result variable called "Reliability" is calculated for each demand site, and is defined as the percentage of all the timesteps in which there was no unmet demand (coverage = 100%). As you see, this is a single number for each demand site for each scenario.

To determine the reliability for a demand site for a single timestep, just check to see if there is any unmet demand, or if coverage < 100%.
Dr. Mehdi Mirzaee

Subject: Re: Reliability   
Posted: 9/10/2010 Viewed: 33344 times
Hi,

If I were you, I would made a spreadsheet with Macros and etc. not only for Reliability, but also for Vulnerability, Resiliency and so on...

Cheers,
Topic "Reliability"