Welcome to WEAP's Website WEAP
WEAP is an initiative of the Stockholm Environment Institute.


About WEAP

Home
Why WEAP?
Features
What's New?
Sample Screens
Demonstration
Publications
History and Credits

Using WEAP
Download
Licensing
User Guide
Tutorial
Videos (YouTube)

User Forum
Discussions
Members List
Edit Profile

Additional Support
Training
University Courses
Collaboration

About Us
SEI-US Water Resources Program
Please Contact Us

LEAP
Interested in Energy?
Read about LEAP: SEI's software for energy planning.

Link WEAP and LEAP for combined Water-Energy planning.
Watch a video demo!
   

User Forum

All Topics | Topic "Transmission losses and supply requirement"
Log in to post new messages or reply to existing messages.
 
Author Message
Mr. Mogamat Fadiel Ahjum

Subject: Transmission losses and supply requirement   
Posted: 7/24/2012 Viewed: 26160 times
Hi,

Why does WEAP not appear to account for a transmission loss from the system?

The supply requirement in my model is unaffected by inclusion of a system loss along transmission links.

Thanks,


Mr. Jack Sieber

Subject: Re: Transmission losses and supply requirement   
Posted: 7/24/2012 Viewed: 26154 times
WEAP distinguishes between losses within a demand site and losses in transmission links. Supply requirements accounts for losses with a demand site, but not from transmission links. To see the transmission link losses, look either at the "Outflows from Area" report of the "Transmission Link Inflows and Outflows" report.

Jack
Topic "Transmission losses and supply requirement"