Welcome to WEAP's Website WEAP
WEAP is an initiative of the Stockholm Environment Institute.


About WEAP

Home
Why WEAP?
Features
What's New?
Sample Screens
Demonstration
Publications
History and Credits

Using WEAP
Download
Licensing
User Guide
Tutorial
Videos (YouTube)

User Forum
Discussions
Members List
Edit Profile

Additional Support
Training
University Courses
Collaboration

About Us
SEI-US Water Resources Program
Please Contact Us

LEAP
Interested in Energy?
Read about LEAP: SEI's software for energy planning.

Link WEAP and LEAP for combined Water-Energy planning.
Watch a video demo!
   

User Forum

All Topics | Topic "After the reservoir start-up"
Log in to post new messages or reply to existing messages.
 
Author Message
Ms. Selin Şipal

Subject: After the reservoir start-up   
Posted: 5/25/2024 Viewed: 1515 times
Hi,

A dam on the main river opens in one of my reference years and is expected to be filled for about 2 years. But in my model, the headflow is suddenly consumed by filling the reservoir, and it is far below the streamflow gauge value. I have both environmental flow requirements and demand sites downstream, but my model fails because this dam suddenly starts to fill with water. How can I calibrate my model/dam to reflect the water retention period?

Thanks.
Mr. Jack Sieber

Subject: Re: After the reservoir start-up   
Posted: 5/26/2024 Viewed: 1507 times
If the reservoir level is below the Top of Inactive (TOI), WEAP will fill it at the highest priority, even above environmental flow requirements and downstream demands. Try setting Top of Inactive to zero initially until the reservoir is filled, or at least until the level is to the Top of Inactive. You can use an Interp expression to change the value of TOI.

Jack
Topic "After the reservoir start-up"